Our Process

Solar Made Simple

From consultation to activation, we handle everything so you can focus on saving.

Step 01

Kickoff & Site Survey

We schedule an in-person site survey to assess your electrical setup and roof condition. Our technician conducts a thorough assessment of your electrical setup and the structural integrity of your roof.

  • Electrical and roof assessment
  • Adult (18+) must be present
  • Safety evaluation
  • Usually completed in one visit

Step 02

Custom Design

Our engineers design the optimal solar panel layout for maximum energy production. We consider roof orientation, sun exposure, shading, and any necessary upgrades.

  • Roof orientation & sun exposure analysis
  • Cost-efficient code-compliant design
  • Shading & obstruction assessment
  • You review and approve within 48 hours

Step 03

Permitting

We handle all permits and approvals with your local jurisdiction on your behalf. Permitting can take up to six weeks depending on your area.

  • We compile & submit all paperwork
  • Most permits approved first attempt

  • We handle any required revisions

  • Coordination with HOA & utility

Step 04

Installation

Our certified crew installs your system, typically in one day. We coordinate material delivery and ensure a smooth, professional installation.

  • Morning arrival, ~8 hour install
  • Access to panels and attic needed
  • Battery installs may take 2 days

  • Inspection scheduled after install

Step 05

Activation

After final inspection and permission to operate from your utility company, we activate your system and you start saving immediately.

  • Local jurisdiction inspection
  • Utility company PTO approval

  • We show you how to monitor

  • Start saving on your electric bill